Optimizing transition: investigating the influence of operational parameters on production scheduling optimization for mines transitioning from open pit to block caving methods

Ignacio Ortiz Flores, Angelina Anani, Haitao Li, Afrooz Jalilzadeh

Research output: Contribution to journalArticlepeer-review

Original languageEnglish
Pages (from-to)1041-1068
Number of pages28
JournalOptimization and Engineering
Volume26
Issue number2
DOIs
StatePublished - Jun 2025
Externally publishedYes

ASJC Scopus Subject Areas

  • Software
  • Civil and Structural Engineering
  • Aerospace Engineering
  • Mechanical Engineering
  • Control and Optimization
  • Electrical and Electronic Engineering

Keywords

  • Crown pillar placement
  • Development cost
  • Dilution factor
  • MILP
  • Production footprint
  • Transition mines

Cite this