@article{6f0d12f5b47f4cf6ad234e90b0c20285,
title = "Cost analysis in the time domain",
author = "Camm, \{Jeffrey D.\} and Gulledge, \{Thomas R.\} and Keith Womer",
note = "Government cost analysts must often construct models using production data that are limited by a contract between the producer and the government. The producer usually does not share cost data with the government unless the contract requires that data are reported.",
year = "1993",
month = aug,
day = "13",
doi = "10.1016/0377-2217(93)90189-T",
language = "American English",
volume = "68",
journal = "European Journal of Operational Research",
}